Nos. 95-3385, 95-3396.United States Court of Appeals, Tenth Circuit.
Filed November 13, 1996.
Page 793
[EDITORS’ NOTE: THIS PAGE CONTAINS HEADNOTES. HEADNOTES ARE NOT AN OFFICIAL PRODUCT OF THE COURT, THEREFORE THEY ARE NOT DISPLAYED.]Page 794
Elizabeth Drill Nay (Thomas M. Martin with her, on the briefs) of Lewis, Rice Fingersh, L.C., Kansas City, Missouri, for Bancamerica Commercial Corporation.
Earl K. Madsen of Bradley, Campbell, Carney Madsen, Golden, Colorado, for Asarco, Incorporated.
Frederick W. Addison, III (Elizabeth E. Mack with him, on the briefs) of Locke Purnell Rain Harrell, Dallas, Texas, for Defendants-Appellants-Cross-Appellees.
Appeal from the United States District Court for the District of Kansas, G. Thomas Van Bebber, Chief Judge.
Before PORFILIO, TACHA and BRORBY, Circuit Judges.
BRORBY, Circuit Judge.
[1] After a series of settlements and party realignments, Plaintiffs Bancamerica CommercialPage 795
Corp. (“Bancamerica”) and ASARCO, Inc. (“ASARCO”) sued Defendants Trinity Industries, Inc. and a subsidiary, Mosher Steel Co., (collectively “Trinity”) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 for contribution to costs the Plaintiffs incurred in an environmental cleanup of an industrial site. Additionally, Bancamerica asserted a pendant state law breach of contract claim. The district court held Trinity partially responsible for the site’s environmental contamination, and ordered Trinity to reimburse Bancamerica and ASARCO for the $555,293.55 in expenses attributable to cleanup of Trinity’s pollution. It also held Trinity liable to Bancamerica for $70,178.07 in unpaid taxes on Bancamerica’s breach of contract claim. We reverse and remand the district court’s refusal to grant Bancamerica and ASARCO prejudgment interest on the Comprehensive Environmental Response, Compensation, and Liability Act award, and affirm the remainder of the district court’s opinion.
[2] The district court’s opinion, found at Bancamerica Commercial Corp. v. Trinity Indus., 900 F. Supp. 1427 (D.Kan. 1995), contains a detailed description of the facts; we provide only a synopsis. From 1899 to 1902 ASARCO operated what was at that time one of the world’s largest lead smelters at the site. From 1907 to 1984 nonparties to this suit operated a steel fabrication facility on the site, using large amounts of lead-based paints and solvents. In 1984 Bancamerica obtained the site through a deed in lieu of forfeiture. Bancamerica immediately leased the site to Trinity, who occupied it until 1987. Trinity also used large amounts of lead-based paints and solvents on the site. ASARCO, the nonparties, and Trinity all contaminated the site to some extent. Id. at 1448-49. [3] Trinity and Bancamerica canceled the lease in 1987, at which time Trinity discontinued operations at the site. In conjunction with this cancellation, Bancamerica contracted to purchase certain cranes located on the site from Trinity for $200,000.00. Trinity claims Bancamerica has not yet paid this sum, and argues this alleged debt offsets the $70,178.07 it owes Bancamerica for unpaid taxes. [4] Upon entry on and investigation of the site, Bancamerica discovered a variety of contamination problems. Trinity left approximately 300 barrels on the site, some of which were leaking and/or contained hazardous substances. Trinity had buried approximately eighty of these barrels in a pit. Three underground storage tanks were leaking gasoline into the soil. Most seriously, the site was highly contaminated with lead. The lead originated from three sources: slag and smelter ash (for which ASARCO was solely responsible), and lead-based paint (for which the nonparties and Trinity were responsible). Id. at 1449. [5] In 1989, the Environmental Protection Agency notified Bancamerica, ASARCO, and Trinity of their potential liability under the Comprehensive Environmental Response, Compensation, and Liability Act. In 1990, the Environmental Protection Agency and Bancamerica entered into an Administrative Consent Order that required Bancamerica to engage in a cleanup of the site. Thereafter, in 1991, the Environmental Protection Agency issued a Unilateral Comprehensive Environmental Response, Compensation, and Liability Act § 106 Order to ASARCO, requiring it to assist in the completion of the cleanup. Bancamerica and ASARCO, without assistance from Trinity, completed the cleanup. They then brought this suit seeking contribution from Trinity. [6] The parties raise seven issues on appeal. The first four, raised by Trinity, are: (1) whether the Environmental Protection Agency orders required Bancamerica and ASARCO to meet the public comment requirements of the national contingency plan; (2) if the district court should have decided whether the cleanup was a “remedial” or a “removal” action; (3) whether Bancamerica was entitled to recover costs incurred in 1988 and 1989, prior to the Administrative Consent Order; and (4) whether Trinity was entitled to an offset against Bancamerica’s claim for unpaid taxes. The issues raised by Bancamerica and ASARCO are: (5) whether Bancamerica and ASARCO were entitled to prejudgment interest; (6) whether the district court erred in considering only toxicity and volume in allocating responsibility (andPage 796
liability) for cleanup of the lead contamination; and (7) whether Trinity breached its lease with Bancamerica through improper maintenance or operation of the underground storage tanks. We reverse the district court’s refusal to award Bancamerica and ASARCO prejudgment interest, and affirm the district court on all other issues. We address these issues in the order presented to us.
I
[7] Did the Environmental Protection Agency orders require Bancamerica and ASARCO to comply with the public comment requirements of the national contingency plan?
(a)(4)(B) (1994).[2] Importantly, a regulation in the national contingency plan provides that “[a]ny response action carried out in compliance with the terms of an order issued by [the Environmental Protection Agency] pursuant to section 106 of [the Comprehensive Environmental Response, Compensation, and Liability Act] . . . will be considered `consistent with the [national contingency plan].'” 40 C.F.R. § 300.700(c)(3)(ii) (1995). Both of the orders under which Bancamerica and ASARCO acted were issued by the Environmental Protection Agency pursuant to § 106, and the district court found that Bancamerica and ASARCO complied with the terms of these orders. Bancamerica, 900 F. Supp. at 1451 n. 2, 1452-53. Accordingly, the court held their response actions were consistent with the national contingency plan. Id. at 1453. [9] On appeal, Trinity contends Bancamerica and ASARCO failed to comply with all of the terms of their orders, and, therefore, the regulation’s presumption of consistency with the national contingency plan is inapplicable. In particular, Trinity claims that language in the orders required Bancamerica and ASARCO to satisfy the national contingency plan’s public comment requirements,[3] and that Bancamerica and ASARCO failed to do so. We review this issue de novo,[4] and finding Trinity’s argument unconvincing, affirm the district court’s holding. [10] Trinity relies on a provision in the Environmental Protection Agency order to Bancamerica that states “all actions required to be taken pursuant to the terms of this Order shall be undertaken in accordance with the requirements of all applicable local, state, and Federal laws and regulations,” and an analogous provision in the Environmental Protection Agency’s order to ASARCO. Trinity contends these provisions required Bancamerica and ASARCO to comply with all the regulations of the national contingency plan (including the public comment requirements) to comply with the Environmental Protection Agency orders. That is, only by satisfying all the requirements of the national contingency plan could Bancamerica and ASARCO comply with the terms of their orders so as to obtain the regulation’s presumption
Page 797
of acting “consistent with the national contingency plan.”
[11] We decline to accept this argument because, as the district court correctly noted, such an interpretation of the Environmental Protection Agency orders “would in effect render meaningless the regulation that deems actions taken in compliance with such orders to be consistent with the [national contingency plan].” Id. The fallacy of Trinity’s argument is obvious. To obtain the regulation’s presumption of consistency with the national contingency plan, Bancamerica and ASARCO would actually need to satisfy every requirement of the plan, thus eliminating any need for the presumption. Furthermore, in the order to Bancamerica, the Environmental Protection Agency expressly stated the work to be performed pursuant to the order, if properly performed, would be “consistent with the provisions of the National Contingency Plan.” Thus, Trinity’s interpretation of the “applicable law” provisions similarly would render meaningless this provision of the Environmental Protection Agency order. [12] Contrary to Trinity’s allegations, our holding does not make meaningless the “applicable law” provisions. Such provisions protect the Environmental Protection Agency from foreclosing additional enforcement options and ensure private persons engaged in a cleanup comply with applicable state and local laws and regulations. Our holding does not impair the accomplishment of these goals. [13] The Environmental Protection Agency’s comments on its regulations, which are entitled to substantial deference, Martin v. Occupational Safety Health Review Comm’n, 499 U.S. 144, 150-51, 111 S.Ct. 1171, 1175-76, 113 L.Ed.2d 117 (1991), further support our holding. When drafting the 1990 national contingency plan,[5] the Environmental Protection Agency clearly contemplated that § 106 orders governing private persons engaged in response actions might not contain all of the “extensive technical and public participation requirements” of the plan. See 55 Fed.Reg. 8666, 8797 (1990). Nonetheless, the Environmental Protection Agency stated such orders contained the cleanup standards necessary for consistency with the national contingency plan, and therefore “defendants will have acted `consistent with the [national contingency plan]’ when they comply with a section 106 order.” Id. [14] Accordingly, we find the correct reading of the “applicable law” provisions of the Environmental Protection Agency orders to Bancamerica and ASARCO to be that they refer to laws and regulations other than the national contingency plan, and did not require Bancamerica and ASARCO to meet the requirements of the national contingency plan. Therefore, we affirm the district court’s holding that the orders did not require Bancamerica and ASARCO to comply with the national contingency plan’s public comment requirements. II
[15] Was it necessary for the district court to decide whether the cleanup was a “Removal” or a “remedial” action?
(E.D.Mich. 1993); Channel Master Satellite Sys., Inc. v. JFD Elecs. Corp., 748 F. Supp. 373, 384
Page 798
(E.D.N.C. 1990). The district court did not decide whether Bancamerica and ASARCO’s response action was properly characterized as a removal or a remedial action. Trinity argues that such an inquiry was a necessary threshold question prior to determining whether the cleanup was “consistent with the national contingency plan.” Additionally, Trinity asserts that Bancamerica and ASARCO’s response action was a remedial action,[6] and that the national contingency plan’s rigorous regulations governing remedial actions were incorporated into the Environmental Protection Agency’s orders through the “all applicable . . . laws and regulations” provisions discussed above. These arguments are simply variants of Trinity’s first contention, and fail for the same reasons.
[17] Because of the regulation presuming consistency with the national contingency plan for response actions performed according to the terms of an Environmental Protection Agency order, see 40 C.F.R. § 300.700(c)(3)(ii) (1995), whether Bancamerica and ASARCO’s response actions are better characterized as removal or remedial is irrelevant. In order for their response actions to be consistent with the national contingency plan, Bancamerica and ASARCO did not need to satisfy any of the plan’s regulations governing either removal or remedial actions; they needed only to satisfy the duties and obligations set forth in the Environmental Protection Agency’s orders. Accordingly, a determination by the district court of whether the response action was a removal or a remedial action was unnecessary.III
[18] Did the district court erroneously allow Bancamerica[7] to recover for response costs incurred in 1988 and 1989?
Page 799
in a vague and ambiguous way” the theory will not be considered on appeal. Id. at 722. Here, we question whether Trinity raised this argument before the district court in even a vague or ambiguous form. Furthermore, Trinity’s new argument gives rise to a host of new issues, and Bancamerica had no opportunity to present evidence it may have thought relevant to these issues. Fear of such an unjust occurrence is one of the primary rationales underlying the rule that appellate courts do not hear issues not previously raised. See Singleton, 428 U.S. at 120, 96 S.Ct. at 2877.
IV
[22] Did the district court err in concluding that Trinity was not entitled to an offset against their breach of contract liability to Bancamerica?
V
[24] Are Bancamerica and ASARCO entitled to prejudgment interest?
(f) (1994), not § 107(a), see Bancamerica, 900 F. Supp. at 1450, and that although § 107(a) provides for prejudgment interest, it does so only for actions proceeding under that section. See 42 U.S.C. § 9607 (a)(4). Trinity further argues § 113(f) does not provide for the award of prejudgment interest, and so Bancamerica’s and ASARCO’s claim must fail.[9] [26] We review the issue of whether prejudgment interest may be granted in § 113(f) contribution actions de novo. See United States v. Diaz, 989 F.2d 391, 392 (10th Cir. 1993) (construction of federal statutes reviewed de novo); Driver Music Co. v. Commercial Union Ins. Cos., 94 F.3d 1428, 1433 (10th Cir. 1996) (Although a “district court’s award of prejudgment interest is generally subject to an abuse of discretion standard. . . . [A]ny statutory interpretation or legal analysis underlying such an award is reviewed de novo.”). We hold prejudgment interest should be granted in § 113(f) actions in the same fashion as it is granted in § 107 actions. [27] In arriving at this holding, we must revisit the relationship between cost recovery actions under § 107(a) and contribution actions under § 113(f). Previous opinions have laid much of the groundwork. See Colorado E. R.R. Co.,
50 F.3d at 1534-36; County Line, 933 F.2d at 1515-17. Pursuant to § 107, the Comprehensive Environmental Response, Compensation, and Liability Act generally imposes joint and several liability on persons deemed responsible for the release or threatened release of hazardous substances. See, e.g., County Line, 933 F.2d at 1515 n. 11. When enacted in 1980,
[The Comprehensive Environmental Response, Compensation, and Liability Act][28] Id. at 1515-16 (citations omitted). We have since held an action between potentially liable persons such as Bancamerica, ASARCO and Trinity to apportion Comprehensive Environmental Response, Compensation, and Liability Act response costs between them is “the quintessential claim for contribution” and proceeds pursuant to § 113 rather than § 107, regardless of how pled Colorado E. R.R., 50 F.3d at 1536, 1538; see also Control Data Corp. v. S.C.S.C. Corp., 53 F.3d 930, 934-35 (8th Cir. 1995) Akzo Coatings, Inc. v. Aigner Corp., 30 F.3d 761, 764 (7th Cir. 1994); but see, e.g., Laidlaw Waste Sys. Inc. v. Mallinckrodt Inc., 925 F. Supp. 624, 629-31 (E.D.Mo. 1996) (allowing potentially liable private party to pursue Comprehensive Environmental Response, Compensation, and Liability Act cost recovery and contribution action under both §§ 107 and 113). [29] However, although such cost apportionment actions must be brought under the rubric of § 113(f), that section does not of itself create any new liabilities. Rather, it simply confirms the right of a person potentially jointly and severally liable under § 107(a) to obtain contribution from other potentially liable persons. See H.R. Rep. No. 99-253(I), 99th Cong., 2d Sess. 79, reprinted in 1986 U.S. Code Cong. Admin.News 2835, 2861 (citations omitted), quoted in County Line, 933 F.2d at 1517. It is no more than a “mechanism for apportioning [Comprehensive Environmental Response, Compensation, and Liability Act]-defined costs.” County Line, 933 F.2d at 1517. Thus, of necessity it must incorporate the liabilities set forth in § 107(a), as those are the costs to be equitably apportioned. See County Line,Page 800
made no express provision for contribution actions among parties held jointly and severally liable under its section 107 liability scheme. As a result, a potentially liable party under section 107 faced the prospect of being singled out as a defendant in a government or private cost recovery action without any apparent means of fairly apportioning [Comprehensive Environmental Response, Compensation, and Liability Act] costs awarded against it to other persons liable for these costs under the statute. The courts responded to the inequity of this situation, and its negative implications for encouraging private parties to undertake voluntary [Comprehensive Environmental Response, Compensation, and Liability Act] cleanups, by recognizing an implicit federal right to contribution under [the Comprehensive Environmental Response, Compensation, and Liability Act]. Congress ratified these efforts in 1986 by amending [the Comprehensive Environmental Response, Compensation, and Liability Act] section 113 to expressly recognize a right of contribution under the statute.
933 F.2d at 1516 (“[S]ection 107(a) must be the source for any right to contribution plaintiffs may have.”); Control Data, 53 F.3d at 934-36 (“Recovery of response costs by a private party under [the Comprehensive Environmental Response, Compensation, and Liability Act] is a two-step process. Initially, a plaintiff must prove that the defendant is liable under [§ 107(a)]. Once that is accomplished, . . . the question is what portion of the plaintiff’s response costs will the defendant be responsible for [under § 113(f)]?” (Footnote omitted)); Avnet, Inc. v. Allied-Signal, Inc, 825 F. Supp. 1132, 1137 (D.R.I. 1992) (“Section 113(f) . . . did not add a new cause of action, but . . . only affirm[s] and make[s] clear an existing cause of action for contribution under Section 107”.). [30] Understanding of this relationship and review of the statutory language of § 107(a) leads us to the inescapable conclusion that prejudgment interest must be awarded in § 113(f) cases just as it is in § 107(a) cases. Section 107(a) makes certain enumerated persons liable for:
[31] 42 U.S.C. § 9607 (a)(4). It further states “[t]he amounts recoverable in an action under this section shall include interest on the amounts recoverable under subparagraphs (A) through (D).” Id. Accordingly, the liability to be apportioned in a § 113(a) contribution action is that set forth in subparagraph (B) of § 107(a), which amount includes(A) all costs of removal or remedial action incurred by [government entities and] (B) any other necessary costs of response incurred by any other person consistent with the national contingency plan.
Page 801
interest. Although § 107 apparently refers only to “actions under this section,” because § 113(f) incorporates the liability provisions of § 107, in that sense a § 113(f) action for contribution is an action under § 107.
[32] Our holding is consistent with logic, policy, and case law. The purpose of contribution is to equitably apportion response costs among liable parties. Failure to grant prejudgment interest on contribution awards may instead result in inequitableapportionment, because parties awarded contribution will still have lost the time value of the money they spent on behalf of other liable persons, and those persons will have gained an equal amount. Further, refusal to grant prejudgment interest is a disincentive for private parties to voluntarily undertake cleanup actions because they will lose the time value of the money they spend on behalf of other persons. Indeed, it would create a perverse incentive for responsible parties to delay involvement in cleanups, because as they delay, they gain the time value of the funds they should be investing in the cleanup. Finally, other courts have awarded prejudgment interest in § 113(f) contribution actions, see, e.g., Browning-Ferris Indus. v. Ter Maat, No. 92 C 20259, 1996 WL 67216, at *4-*5 (N.D.Ill. Feb. 16, 1996); Boeing Co. v. Cascade Corp., 920 F. Supp. 1121, 1132, 1140
(D.Ore. 1996), whereas we are aware of no cases holding § 107(a)’s authorization of prejudgment interest inapplicable to § 113(f) actions. [33] Our holding that § 113(f) incorporates the prejudgment interest provision of § 107(a) does not end discussion of whether Bancamerica and ASARCO are entitled to such interest. Section 107(a) states:
[34] 42 U.S.C. § 9607 (a)(4). [35] The district court, applying § 107, refused to grant Bancamerica and ASARCO prejudgment interest for two reasons. First, correctly noting that “prejudgment interest does not accrue until written demand for a specific dollar amount is made,” it found Bancamerica and ASARCO had failed to make such a demand. Bancamerica, 900 F. Supp. at 1470. Second, the court held that even if Bancamerica and ASARCO had made the required demand, they were not entitled to prejudgment interest because they had not provided the court with the applicable interest rates or a method with which to compute the interest. Id. We review the district court’s decision to withhold prejudgment interest for an abuse of discretion. Driver Music, 94 F.3d at 1433. [36] We hold the district court abused its discretion in finding Bancamerica and ASARCO failed to meet the demand requirement of § 107(a). On January 20, 1989, Bancamerica sent a letter to Trinity stating Bancamerica had incurred $45,818.31 for environmental work performed on the site, and that it believed Trinity to be responsible for these costs. The letter further requested that Trinity mail Bancamerica a check for $45,818.31. This letter is clearly a written demand for a specific dollar amount and therefore satisfies the statute.[10] ASARCO made demand on August 13, 1993, when Bancamerica and ASARCO filed their Third Amended Complaint. In this Complaint, ASARCO notified Trinity it had incurred response costs “in excess of $1 million,” for which it was seeking reimbursement (plus interest from the date of expenditure). This demand of at least $1 million in response costs satisfies § 107(a)’s requirement of a written demand of a specific dollar amount. See In re Bell Petroleum Servs., Inc., 3 F.3d 889, 908 (5th Cir. 1993).interest shall accrue from the later of (i) the date payment of a specified amount is demanded in writing, or (ii) the date of the expenditure concerned. The rate of interest on the outstanding unpaid balance of the amounts recoverable under this section shall be the same rate as is specified for interest on investments of the Hazardous Substance Superfund established under subchapter A of chapter 98 of title 26.
Page 802
[37] We also hold the district court’s refusal to grant Bancamerica and ASARCO prejudgment interest because they had not provided the court with interest rates or a method with which to compute the appropriate interest was an abuse of its discretion. Such a requirement is stated nowhere in the statute. Rather, § 107(a) speaks in mandatory terms: “The amounts recoverable . . . shall include interest.” 42 U.S.C. § 9607(a)(4). Furthermore, the statute itself provides the applicable interest rates, stating the interest rate shall be the same as that for Superfund investments. Id. The rates for 1989 through 1993 were identified in Hatco Corp. v. W.R. Grace Co. — Conn., 836 F. Supp. 1049, 1090 (D.N.J. 1993), a case that Bancamerica and ASARCO cited to the District Court in their Post-Trial Brief, and in any event were available to the district court from the Department of the Treasury or the Environmental Protection Agency. See id. The prejudgment interest should be calculated using generally accepted accounting principles. [38] We do agree with the district court that it is appropriate to require those requesting prejudgment interest to provide the court with proper calculations setting forth the interest they seek. However, we also agree with Bancamerica and ASARCO that, because interest determinations are compounded calculations, it may be impossible for parties to provide accurate calculations prior to the court’s allocation of response cost liability. In such instances, parties may submit their interest calculations to the court subsequent to that finding. See United States v. Hardage, 750 F. Supp. 1460, 1495-96 (W.D.Okla. 1990), aff’d, 982 F.2d 1436 (10th Cir. 1992), cert. denied, 510 U.S. 913, 114 S. Ct. 300, 126 L.Ed.2d 248 (1993); United States v. Northernaire Plating Co., 685 F. Supp. 1410, 1421 (W.D.Mich. 1988), aff’d, 889 F.2d 1497 (6th Cir. 1989), cert. denied, 494 U.S. 1057, 110 S. Ct. 1527, 108 L.Ed.2d 767 (1990). [39] Accordingly, we hold Bancamerica and ASARCO are entitled to prejudgment interest on the response costs awarded them, accruing from the later of the dates Bancamerica and ASARCO made their respective demands upon Trinity or the date of the expenditure concerned. See 42 U.S.C. § 9607 (a)(4). We remand to the district court for determination of the appropriate amount of such interest.
VI
[40] Did the district court err in considering only toxicity and volume in allocating liability for the site’s lead contamination?
(f)(1). Here, the district court considered “the approximate volume of total lead at the Site contributed by [Trinity], and the degree of toxicity of the lead,” and held Trinity responsible for five percent of the total response costs related to lead contamination. Bancamerica, 900 F. Supp. at 1473-74. Bancamerica and ASARCO argue the district court should have considered additional factors in calculating the allocation of lead response costs, and accordingly increased Trinity’s allocation. [42] The district court has “considerable discretion in apportioning equitable shares of response costs.” FMC Corp. v. Aero Indus., Inc., 998 F.2d 842, 846 (10th Cir. 1993). We reverse only upon an abuse of that discretion. See id. at 847; United States v. R.W. Mever, Inc., 932 F.2d 568, 573 (6th Cir. 1991). This holds particularly true in a complex case such as this one, wherein the district court engaged in extensive fact-finding during a trial lasting more than seventeen days. [43] Although courts have looked to a number of factors in making such allocations, see, e.g., Environmental Transp. Sys., Inc. v. ENSCO, Inc., 969 F.2d 503, 508-09 (7th Cir. 1992) (listing possible considerations), the Comprehensive Environmental Response, Compensation, and Liability Act states the court need only consider those equitable factors it deems appropriate. 42 U.S.C. § 9613 (f)(1). Indeed, we have stated “a court may consider several factors, a few factors, or only one determining factor, . . . depending on the totality of the circumstances presented to the court.” Colorado
Page 803
E. R.R Co., 50 F.3d at 1536 (quoting Environmental Transp. Sys, Inc., 969 F.2d at 509). The clause “depending on the totality of the circumstances” does not, as Bancamerica and ASARCO argue, mandate that the district court weigh all possibly relevant factors. It is simply a statement of the self-evident proposition that the circumstances of the contamination and the cleanup will drive the district court’s determination of what equitable factors are appropriate to consider. After review of both the record and the district court’s fifty-six-page (excluding headnotes) opinion, we cannot say the district court abused its discretion in considering only the two factors noted above.[11]
VII
[44] Did the district court err in failing to award Bancamerica damages on its breach of contract claim regarding the underground storage tanks?
(10th Cir. 1993) (statutory construction issues reviewed de novo), and contract interpretation, see Reese Exploration, Inc. v. Williams Natural Gas Co. 983 F.2d 1514, 1518-19 (10th Cir. 1993) (interpretation of unambiguous contract terms reviewed de novo), rather than focusing on factual questions of the actions Bancamerica and ASARCO did or did not take.